Foundries
Chemical Industry
Mining Industry
Cement Industry
Incineration
Previous slide
Next slide

Welcome to

Setimep

With over than 30 years of experience at the service of national and international customers, our objective, in addition to complying with the legislation, concerning to pollutant particle emissions, is also to ensure high energy efficiency, robustness and durability of equipment, with direct impact on the number of interventions and maintenance shutdowns.

Capas Setimep

SETIMEP project, build and install filtration, air purification equipment’s and spares related.

Highlight Projects

Biomass Plant / PT
Filter 550m²

Biomass Plant / PT
Filtro 1180m²

Cutting Saw / ES
Filter 180m²

Gypsum Calcination / FR
Filter 650m²

setimep

biomass plant | pt

Description:

The installation is intended to produce electrical energy (2 MW / h) from thermal sources | BIOMASS CENTER _ from olive pomace.
Gaseous effluent treatment.

Characteristics:

Images:

setimep

biomass plant | pt

Description:

The installation is intended to produce electrical energy (3 MW / h) from thermal sources | BIOMASS Plant _RIB’s. Gaseous effluent treatment

Characteristics:

Images:

setimep

cutting saw | es

Description:

Plasterboard sheets Cutting

Gaseous effluent treatment | Integrated solution from the cutting machine to the recycling of the waste obtained.

Characteristics:

Images:

setimep

GYPSUM CALCINATION | fr

Description:

Gaseous effluent treatment | Integrated solution for treatment of gaseous effluents from the plaster calcination sector, thermal reuse with exchanger

Characteristics:

Images:

Este site utiliza cookies para lhe oferecer a melhor experiência possível.
Ao navegar no site está a aceitar a política de cookies e de privacidade da Setimep.